Installation of pressure bars between glazing panels on west side of office building (08/10/20)
Workers install framing at south end of office building (08/10/20)
Installation of sheetrock on interior of office building (08/10/20)
Prepared for pavement at walkway between office building and garage (08/10/20)
Placed forms for the top of the stormwater vault at east end of garage (08/10/20)
Rainwater impacted area prepped for pavement in garage (08/10/20)
Placed rebar & forms for driveway to garage at St. Charles entrance (08/10/20)
Crew cleans residue from recently installed curtain wall members (08/10/20)
Roofing material on high roof of residential building (07/27/20)
Insulation place on HVAC equipment in office building (07/27/20)
Insulation placed in exterior wall on east side of office building (07/27/20)
Level 4 of garage with concrete driving surface in place (07/27/20)
Workers install framing on patio of office building (07/27/20)
Pavement repair on Emancipation Ave. at south side of Elgin (07/27/20)
Asphalt pavement surface restored at Emancipation Ave. and Elgin intersection (07/27/20)
Roof prior to HVAC equipment being installed on office building (07/27/20)
Final roof surface material in place on office building (07/27/20)
Workers prepare to install glazing for window of office building (07/27/20)
Hurricane clips installed on framing for residential building (07/20/20)
Worker places waterproofing material on window frame at residential building (07/20/20)
Began installing stairs in stairwell at north end of residential building (07/20/20)
Southeast side of garage with all precast concrete sections in place (07/20/20)
Workers build CMU perimeter wall on Level 1 at southeast corner of garage (07/20/20)
A section of CMU perimeter wall in place on Level 1 of garage (07/20/20)
The top of the stormwater vault is prepped for concrete on Level 1 of garage (07/20/20)
Parking garage ramp from Level 2 to Level 3 (07/20/20)
Installed trench drain for walkway between garage and office building (07/20/20)
Wide view of trench drain installation between garage and office building (07/20/20)
Glazing in place for northern half of west side of office building (07/13/20)
Crew continues to install glazing for southern half on west side of office building (07/13/20)
Concrete paving and curb replaced on Emancipation Ave. (07/13/20)
Supplies including insulation and sheetrock are moved to first floor for storage at office building (07/13/20)
Workers are lifted up to continue framing work on office building (07/13/20)
Continued framing on 3rd story of residential building (07/13/20)
West side of residential building with framing in place (07/13/20)
Parking garage ramp from Level 2 to Level 3 (07/13/20)
Began installing sheetrock (light green area on 1st floor elevation) on the west side of the office building (04/06/20)
Two crews installing exterior wall studs & window frames on the east side of the office building (04/06/20)
Placed concrete bottom for northern half of the stormwater detention vault under garage (04/06/20)
Installed rebar for bottom of southern half of stormwater detention vault (04/06/20)
New storm sewer inlet at the northwest corner of St. Charles & Elgin (04/06/20)
Installed duct bank on Elgin adjacent residential site (04/06/20)
Installed more HVAC duct in office building (04/06/20)
Close-up view of sheetrock being installed on the west side of the 1st floor of office building (04/06/20)
Concrete placed in bottom of northern half of stormwater detention vault under garage (04/06/20)
Residential site as seen from office building (04/06/20)
New CenterPoint ductbank and manhole on Elgin (03/23/20)
Concrete columns placed for residential podium (03/23/20)
Water break tank installed on 1st floor of office building (03/23/20)
Interior wall studs installed on 1st floor of office building (03/23/20)
Fireproofing and fire sprinkler lines in place on bottom of 2nd story (03/23/20)
Steel davits prepped for installation (03/23/20)
New box culvert storm sewer being installed on St. Charles across Elgin (03/16/20)
Concrete top in place for storm sewer vault at the residential site (03/16/20)
Roof steel framing being installed for office building (03/16/20)
Forms & rebar in place for placement of concrete top on storm sewer vault at the residential site (03/02/20)
Placed contrete floor on the 2nd story (03/02/20)
Workers began to layout walls & studs for the 2nd story (03/02/20)
Protective covering installed along the Emancipation sidewalk to protect pedestrians from falling objects (02/24/20)
Stairs installed on upper floor levels (02/17/20)
Floor decking in place now on 2nd and 3rd stories (02/07/20)
Crane swinging new steel beam into place (02/03/20)
Erected structural steel up to the 5th story (02/03/20)
Installed floor decking on the 3rd story (01/27/20)
Erected structural steel up to the 3rd floor for the southern end of the building (01/13/20)
Formed walls stormwater detention vault at the residential site (01/13/20)
Building elevator shaft cast in place (12/17/19)
Building slab with electrical & plumbing pipe (12/17/19)
Prepped building slab for concrete (12/10/19)
Form elevator shaft foundation for building (11/26/19)
Large crane for drilling deep foundation shafts (10/29/19)
Concrete pumping for drilled shaft foundations (10/08/19)
St. Charles construction entrance w/silt fence up (09/10/19)
Field Office set up w/ perimeter fence (09/03/19)
Equipment clearing grass off the surface (09/03/19)

 

Rendering 2020

Completion Scheduled for December 2020

One Emancipation Center, an Affordable Housing Operations Center, will ccuse organizations that are engaged in affordable housing production, affordable housing advocacy, affordable housing administration and affordable housing support services, such as housing counseling. It is anticipated that a number of citywide housing organizations will operate in this facility.

At present, there is no centrally located public facility that can house such organizations in one building. There is also no centrally located public facility that serves as a clearinghouse for affordable housing information and provides a venue for training nonprofit affordable housing providers. One Emancipation Center’s central location makes it easily accessible to all of the Mayor’s Complete Communities neighborhoods, existing and prospective, as well as other neighborhoods affected by Hurricane Harvey and preceding disasters.

Contact us for more information.

 

Asset 3

Click here to view previous construction photos

 

 

short logo
Center for Civic and Public Policy Improvement
5445 Almeda Rd, Ste 504, Houston, TX 77004
(346) 204-4542

 Asset 122x    Asset 232x     Asset 322x    Asset 142x